A: Yes, Appendix D covers the optional "Profometer 4 Wheel Probe" for rapid scanning. It requires recalibration of distance per revolution.
A standardized plastic block with a built-in metallic simulator used to verify system accuracy. Core Specifications
: To show the consistency of rebar placement. proceq profometer 4 manual
The Profometer 4 is engineered for harsh construction environments, but regular preventative maintenance prolongs its operational life. Battery Management
: Reacts most sensitively to bars parallel to its longitudinal axis; for best results, it should be moved sideways over the bars. Hammond Concrete Services Display Unit A: Yes, Appendix D covers the optional "Profometer
The analog signal received by the instrument is a factor of both the and its depth (cover) .
: Measures the thickness of concrete covering the rebar to ensure structural durability. Diameter Estimation Core Specifications : To show the consistency of
A large rebar buried deep in concrete can produce the same signal response as a small rebar located close to the surface.
To install the battery, remove the protective film and lift up the holder in the manner shown. Insert the battery and secure it with the screw. It is essential to charge the battery for 8 hours before the first use by connecting it to the power supply. During charging, the top LED will be red; it will switch to green when the battery is fully charged. A fast charger (part number 327 01 053) is available as an option to reduce the charging time to less than 5.5 hours.