Hilger Watts Theodolite Manual Repack _best_ -
Ensure the objective lens cap is securely fitted. Turn the eyepiece focus ring fully inward to its lowest profile setting. Phase 2: Identifying Case Geometry and Keying Systems
: Ensure all ball bearings are accounted for and seated correctly in their cups before closing the assembly.
Carefully pull the main vertical axis spindle straight up out of its matching tapered outer socket. Warning: Do not rock or tilt the spindle during extraction, as the tolerances are incredibly tight; any binding can score the precision surfaces.
Thread the three leveling footscrews on the tribrach upward until they are uniform and near the top of their threads. This minimizes the vertical profile of the base. hilger watts theodolite manual repack
Fasten any canvas or leather buckle straps across the top standards.
He decided, without much drama, to repack it properly. He laid the manual open, smoothed the oilcloth, and wrapped the theodolite as if returning it to an original owner. He threaded the red string through the booklet’s binding and, with care learned from years of watching someone else work, pulled it tight.
Action: Clean, polish, and lubricate with a light, non-gumming instrument grease. B. Tangent Screws and Clamps Ensure the objective lens cap is securely fitted
By investing time and effort into manual repack, you'll be able to optimize your Hilger Watts theodolite's performance, ensuring accurate measurements and successful project outcomes.
Repacking the bearings of a is a delicate restoration task typically performed to resolve stiff motion caused by aged, hardened grease . Because these vintage instruments use high-precision bearings, the process requires surgical cleanliness and specific lubricants to maintain original accuracy. Core Repacking Process
The company was formed on 20 February 1948 from the merger of two respected London firms: Adam Hilger, Ltd. (founded in 1874), and E. R. Watts & Son (founded in 1865). At its peak, the company employed around 1,300 people across six factories, with its main sites in Camberwell, Highbury, Camden Town, and Loughton in Essex. Carefully pull the main vertical axis spindle straight
Slide the removable wooden blocking wedges into their guide rails to lock the upper assembly in place. 4. Storing Accessories
Turn the three tribrach leveling screws until they are halfway through their total travel length. This ensures even weight distribution on the base pads.